Practical Research on Integrated Geophysical Prospecting Technology in Identifying Fault Fracture Zones in Mountain Tunnels
Taking a certain mountain tunnel project as the research carrier, this paper integrates ground-penetrating radar (GPR), the high-density electrical resistivity method, and the seismic reflection method to build a three-in-one integrated geophysical prospecting technology system. During the study, the geophysical response patterns actually exhibited by fault fracture zones were first sorted out, and the internal mechanism of multi-method joint identification technology was explained. Subsequently, in combination with various objective constraints at the construction site, the procedures of detection layout, field acquisition, and in-office data processing were adjusted, thereby completing high-quality full-coverage detection of deep and shallow geological conditions. This compensates for the technical deficiencies of a single detection method, accurately extracts anomalous boundaries and water-bearing-related characteristics of fracture zones, and provides a referable technical basis for adverse geological forecasting and construction site safety prevention and control in mountain tunnels.
[1] Ye W, Zhou JH, Chen N, et al., 2026, Application of Geophysical Prospecting Technology in the Whole Process of Tunnel Construction. China Railway, 2026(3): 101–109.
[2] Lyu HL, 2026, Application of Integrated Geophysical Prospecting Methods in Urban Rail Transit Engineering Investigation: A Case Study of Yuanshan Station–Apollo South Station on Shenzhen Metro Line 16. Resources Information and Engineering, 41(2): 45–49.
[3] Chen N, Zhao YH, Wang H, et al., 2024, Research on the Application of Integrated Geophysical Methods in the Investigation of Long and Deeply Buried Tunnels. Progress in Geophysics, 39(6): 2420–2431.
[4] Chen C, 2026, Application and Verification of Integrated Geophysical Prospecting Methods in the Investigation of Daxiangshan Tunnel on Fuzhou Coastal Express Line. City Weekly, 2026(12): 157–159.
[5] Gong H, 2026, Research on Optimized Application of Integrated Geophysical Prospecting Technology for Advanced Geological Prediction in Tunnels. Transport Manager World, 2026(17): 102–104.
[6] Ma T, 2025, Research on the Application of Integrated Geophysical Prospecting Technology in Tunnel Collapse Emergency Rescue. Chinese Journal of Engineering Geophysics, 22(2): 191–198.
[7] He CL, 2025, Application of Integrated Geophysical Prospecting in Tunnel Investigation in Hilly and Mountainous Areas. Site Investigation Science and Technology, 2025(4): 69–75.
[8] Sun TL, 2025, Practice and Effect Evaluation of Integrated Geophysical Prospecting Technology in Tunnel Hydrogeological Investigation. Engineering Technology Research, 10(7): 210–212.
[9] Lin XQ, Deng TL, Xiao DW, et al., 2026, Research on Optimization and Integrated Application of Geophysical Prospecting Technology for Advanced Geological Prediction in Long Railway Tunnels. Architecture Technology, 57(12): 1462–1467.
[10] Liu JC, Zhou YB, Xing XY, 2024, Application research of Integrated Geophysical Prospecting Methods in the Investigation of Adverse Geological Bodies in Tunnels in High-Cold and High-Altitude Areas: A Case Study of Maqin Tunnel. Technology Innovation and Application, 14(11): 147–150 + 155.