Research on Compliance Risk Control and Optimization Strategies for the Whole-Process Bidding and Procurement of Road, Bridge and Tunnel Inspection Projects

Zhou Zhang1 ,  Zonglin Zhou1*
Show Less
1 China Merchants Chongqing Testing Center for Highway Engineering Co., Ltd., Chongqing 400067, China
© 2026 by the Author(s). Licensee: Bio-Byword Scientific Publishing Pty Ltd, Australia. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution 4.0 International License ( https://creativecommons.org/licenses/by/4.0/ )
Abstract

Road, bridge, and tunnel inspection projects are critical to the quality and safety of transportation infrastructure. To ensure the effective implementation of inspection work, enterprises generally adopt bidding and procurement to select qualified and efficient inspection service providers, thereby reasonably controlling the procurement quality of engineering inspection services while improving the efficiency of state‑owned assets. Considering the current bidding and procurement of road, bridge, and tunnel inspection projects, these processes are characterized by strong professionalism, high technical evaluation requirements, and dynamic performance management. Traditional risk supervision mechanisms can no longer meet the whole‑process control requirements for the procurement of such inspection projects. Accordingly, this paper focuses on summarizing risk issues from four dimensions—preliminary preparation, announcement and bidding document issuance, bid opening and evaluation, and contract performance—and proposes compliance risk optimization measures, aiming to provide a reference for the high‑quality development of road, bridge and tunnel projects.

Keywords
Road, bridge, and tunnel inspection projects
Bidding and procurement
Whole process
Compliance risk
Intelligent risk control
References

[1]       Lian B, 2024, Prevention and Handling of Bidding and Procurement Risks in State-Owned Enterprises. China Market, 2024(4): 84–87.

[2]       Pei J, 2024, Discussion on Risks and Optimization Strategies of Construction Project Bidding and Procurement. North-South Bridge, 2024(10): 124–126.

[3]       Li S, 2024, Risk Identification and Response Strategies for Construction Project Bidding and Procurement. Construction and Decoration, 2024(1): 129–131.

[4]       Shang H, 2024, Construction of Risk Prevention and Supervision System for Bidding and Procurement. Bidding and Procurement Management, 2024(12): 19–21.

[5]       Gao Y, 2024, Analysis of Risk Control and Supervision Mechanisms for State-Owned Enterprise Bidding and Procurement in the Digital Age. China Science and Technology Investment, 2024(32): 98–100.

[6]       Chang C, 2025, Analysis of Municipal Engineering Bidding and Procurement Risks and Optimization Strategies. China Real Estate Industry, 2025(28): 42–45.

[7]       Zhang Y, 2021, Problems and Countermeasures in Bidding Management of Construction Projects in China. China Strategic Emerging Industries, 2021(40): 160–162.

[8]       Luo H, 2021, Problems and Optimization Measures in Construction Project Bidding. Construction Engineering Technology and Design, 2021(18): 1574.

[9]       Huang J, 2025, Cost Control and Pathway Selection for Project Bidding and Procurement Management. Shandong Transportation Science and Technology, 2025(4): 136–138.

[10]     Zhao H, Wang H, 2025, Study on Quality Defects and Improvement Measures in Highway, Bridge and Tunnel Construction. China Brand and Anti-Counterfeiting, 2025(4): 238–240.

Share
Back to top